Mechanical Project Manager (Data Center Construction) - Insight Global : Job Details

Mechanical Project Manager (Data Center Construction)

Insight Global

Job Location : Boydton,VA, USA

Posted on : 2025-08-08T02:08:52Z

Job Description :

Mechanical Engineer - Data Center Construction Manager

Location: Southern Virginia (23917)

Duration: 12-18 month contract to hire -- will convert to permanent / FTE!

Schedule: Standard 8AM – 5 PM w/10 hours of OT

Day-to-Day: The main function of a construction manager is to plan, direct, or coordinate activities in such fields as engineering, research and development, financial systems and product roll-out, etc. Research and investigate the design, functionality and maintenance of mechanical products, equipment, systems and processes. A typical mechanical engineer/Construction Manager has the ability to make engineering drawings, and read and interpret blueprints.

  • Research, design, develop, manufacture, and test tools, engines, machines and other mechanical devices.
  • Research and analyze customer design proposals, specifications, manuals to determine time and cost feasibility to complete projects.
  • Investigate equipment failures and difficulties to diagnose faulty operation and make recommendation to maintenance crew.
  • Assist drafters in developing the structural design of products using tools, equipment or software.

Skills:

  • Creativity, verbal and written communication skills, analytical and problem solving ability.
  • Team player and detail oriented.
  • Ability to make sketches, engineering drawings and common computations.
  • Ability to read and interpret blueprints, technical drawing, schematics and computer-generated reports.
  • Previous experience with computer applications and software related to engineering field, such as Computer Aided Design (CAD).
  • Knowledge of production processes, quality control, costs and other techniques for maximizing the effective manufacture and distribution of goods.

Requirements:

  • BS in Mechanical Engineering
  • 10 years of experience within Construction of Hyperscale Data Centers
  • Ability to make engineering drawings
  • Read and interpret blueprints
  • Business and management principles in strategic planning, resource allocation, production methods
  • MEP Experience
  • Previous Experience managing a Safety Program

Nice to Have:

  • Previous experience working at a utility company.
  • PMP / PMI Certification

Compensation:

$60/hr to $80/hr

$3K/month in expenses (per diem)

Exact compensation may vary based on several factors, including skills, experience, and education.

Benefit packages for this role will start on the 1st day of employment and include medical, dental, and vision insurance, as well as HSA, FSA, and DCFSA account options, and 401k retirement account access with employer matching. Employees in this role are also entitled to paid sick leave and/or other paid time off as provided by applicable law.

Benefits:

Apply Now!

Similar Jobs ( 0)